Eastcroft Walkways and Lighting
Design, supply and install upgrade works for EMR at Eastcroft depot
Customer
EMRDate Completed
March 2026Sector
Rail InfrastructureProject Overview
Eastcroft Upgrade Works
EMR appointed Cairn Cross to update the existing infrastructure and bring it into full compliance with current standards, with a focus on improving safety, accessibility, and visibility across the depot. The works comprised the design, supply, and installation of a 145LM GRP walkway complete with integrated LED strip lighting along its full length. In addition, LED lighting was installed to the drip tray throughout the main shed to enhance footpath visibility.
As part of the compliance upgrades, non-compliant handrails were removed and replaced with 45LM of compliant GRP handrails. The project also included the modification and extension of an existing GRP walkway to Road 14, ensuring a cohesive and fully compliant access solution.
Project Details
Services delivered included:
- GRP Walkways
- GRP Handrails