Central Rivers Wheel Lathe
A Design & Build project to supply a brand new tandem wheel lathe facility with new building and new p-way siding.
Customer
Bombardier/Alstom RailSector
Rail InfrastructureSouthend Victoria AVIS
To install an AVIS system along the existing carriage wash at Southend Victoria Depot
Customer
Greater AngliaSector
Rail InfrastructureTim Horton’s Restaurants
Cairn Cross was instructed to undertake all external civil works on a build-only basis for a new restaurant chain.
Customer
ThompsonsSector
Highway, Bridges & StructuresHull Botanic Gardens Maintenance Depot Extension
Rail depot infrastructure upgrades and structural modifications to rail shed building.
Customer
Northern RailSector
Rail InfrastructureKing’s Heath AVIS
To install an AVIS system along the existing carriage wash at King’s Heath Depot
Customer
SiemensSector
Rail InfrastructureGreenholme Mills
Groundworks to renovate a textile mill into luxury apartments.
Customer
MMRSector
Highway, Bridges & StructuresSt Nicholas Church Retaining Wall Restoration
Cairn Cross has completed works repairing a retaining wall on the boundary of St Nicholas Church, Bradfield.
Customer
St Nicholas ChurchSector
Highway, Bridges & StructuresOxley Depot Subsidence
Due to subsidence issues, Cairn Cross replaced 137m length of the Road 16 rail pit walls and associated works.
Customer
AlstomSector
Rail InfrastructureNeville Hill Wheel Lathe
Project to deliver the civils and foundations for the installation of the Network Rail owned Wheel Lathe.
Customer
RMTSSector
Rail InfrastructureA511 Junction & Level Crossing Works
This project formed part of the Bardon Hill Quarry Extension Project – Phase 1. The requirement was for upgrade works to the A511 highway and upgrade of the existing Level Crossing.
Customer
Aggregate IndustriesSector
Highway, Bridges & StructuresTingley Mills Phase 1 Infrastructure Works
As part of the Tingley Mills Residential Phase One redevelopment, Cairn Cross supplied various groundworks, drainage, storm attenuation and S278 surfacing works.
Customer
MMRSector
Highway, Bridges & StructuresHayle Bridge Strengthening Works
Strengthening works to the bridge spanning the Copperhouse Pool tidal reservoir
Customer
Home BargainsSector
Highway, Bridges & StructuresCET Upgrade & Installation at Stockport
Design and build project to upgrade the Stockport Sidings CET system to enable CET operations on the new rolling stock fleet.
Customer
Northern RailSector
Rail InfrastructureSheffield LMD Works
Project to increase the servicing capacity at Sheffield Depot. The provision of Canopies, services, lighting and TrackPan containment at each end of the shed increased fueling provisions, AdBlue, CET point, expanded oil distribution facility.
Customer
Northern RailSector
Rail InfrastructureWednesbury Access Platforms
Cairn Cross built Steel Structure and gantry walkways to access the top of the trains in the depot.
Customer
Transport for West MidlandsSector
Rail InfrastructureOxford Beech House Basement Works
The project required the excavation and installation of a new waterproof reinforced concrete basement to support a five-story student accommodation building.
Customer
Winvic Construction LtdSector
Highway, Bridges & StructuresToton Wheel Lathe
DB Schenker required a new U2000-400 underfloor wheel lathe at Toton to replace the current ageing Lathe. Cairn Cross removed the old Lathe and altered the existing pit to accept the new Lathe.
Customer
DB Cargo UKSector
Rail InfrastructureElland Road Bridge Replacement
Cairn Cross worked as a Specialist Subcontractor to help deliver a replacement of a two-track bridge in Leeds, Yorkshire.
Customer
May GurneySector
Highway, Bridges & StructuresNew RRV Maintenance Shed at Crewe
Design and build scheme to provide a new shed facility to accommodate Road Rail Vehicles (RRV) on the depot.
Customer
Network RailSector
Rail InfrastructureTrain Wash Systems in Perth
Train Wash Systems Facility was constructed along with associated electrical and waterworks in Perth, Scotland.
Customer
Network RailSector
Rail InfrastructureCarriage Wash Installation at Holyhead
A Design and Build contract to deliver a new carriage wash shed and facilities to wash trains on the sidings at night so that vehicles are cleaned and maintained before leaving the depot in the morning.
Customer
Network RailSector
Rail InfrastructureOld Flatts Bridge Strengthening Works
Due to the shortening of the span between the abutment faces, the client required rehabilitation to restrengthen the bridge.
Customer
Eurovia ContractingSector
Highway, Bridges & StructuresLongsight Front Entrance and Car Park
A new security building and car park facility were required at the entrance to the existing maintenance depot.
Customer
AlstomSector
Highway, Bridges & StructuresCraigentinny Underfloor Wheel Lathe Installation
Turnkey design and build contract to replace a single-headed wheel lathe with a new single headed Hegenscheidt CNC wheel lathe requiring actuations to the existing structure.
Customer
Network RailSector
Rail InfrastructureThornhill Bridge Strengthening Works
This project was to supply grit blast painting and a new concrete bridge deck to comply with highway loadings.
Customer
Network RailSector
Highway, Bridges & StructuresOxley Train Depot Extension
Provision of a new shed facility to accommodate the new 11 car fleet of trains.
Customer
Alstom TraincareSector
Rail InfrastructureQueens Road New Maintenance Depot
Design and build contract for the provision of a maintenance workshop and associated works.
Customer
Stagecoach MetrolinkSector
Rail InfrastructureControlled Sewer Overflow (CSO) Installation at Darnall
Construction and associated works of multiple Combined Sewer Overflow (CSO) units for Yorkshire Water.
Customer
Peter Duffy & Yorkshire WaterSector
WaterTodwick Road Bridge Deck Replacement
Working as a specialist subcontractor, Cairn Cross helped deliver the deck replacement on behalf of Ringway.
Customer
RingwaySector
Highway, Bridges & Structures