Glasgow AVIS & Carriage Wash

Design and build project to replace an AVIS and carriage was facility at SPT depot.

Customer

Wilcomatic

Date Completed

2018

Sector

Rail Infrastructure

Shelter Concrete Base Cairn Cross
01.

The Challenge

Wilcomatic required the existing carriage wash at SPT depot Govan to be replaced through a design and build project.

Carriage Wash & AVIS Structure Installation Cairn Cross
02.

The Solution

The existing carriage wash was dismantled and bases excavated. New concrete bases and existing drainage was modified to allow pumping to a new reclaim system. The AVIS system was installed at the east end of the new steel structure

Carriage Wash Structure Installation Glasgow Cairn Cross
03.

The Result

Without causing disruption to the depot and on going maintenance, the project was delivered safely and on time back to the client.