King’s Heath AVIS

To install an AVIS system along the existing carriage wash at King’s Heath Depot

Customer

Siemens

Date Completed

2022

Sector

Rail Infrastructure

Project Overview

To install an AVIS system along the existing carriage wash at King’s Heath Depot


01.

The Challenge

To reduce TOC Rolling Stock Maintenance requirements, an Automated Vehicle Maintenance System (AVIS) was required along the existing Carriage Wash Road at King’s Heath Depot in Northampton.
This would include structural bases to allow a safe and secure installation, whilst maintaining an Operational Railway.

02.

The Solution

Several Possession and Isolations were taken along the existing Carriage Wash Road to allow excavation and installation, which included specialised Crane lifts, 25m of new P-Way, and a comprehensive electrical fit-out.
Structural calculations were made to ensure the concrete aprons could withstand the specialist equipment, and a full perimeter Share Barrier erected to reduce any risk of Laser damage.

03.

The Result

The AVIS now provides the TOC opportunity to reduce their maintenance requirements of either Rolling Stock by capturing laser measurements of key train components.