Cairn Cross completed the new facility and handed the depot over to the client within 10 months of ground work commencing.
The depot’s construction formally started late November 2022, with a ground-breaking event at the GBRf House, Peterborough. Councillor Wayne Fitzgerald (Leader of Peterborough City Council) was in attendance, in addition to John Smith (Chief Executive Officer, GB Railfreight) and Ian Bald (Technical Director, Cairn Cross).
GB Railfreight unveiled the new state of the art maintenance depot in Peterborough alongside the East Coast Mainline on Tuesday, 26th September, with Secretary of State for Transport Mark Harper MP and CEO of GB Railfreight, John Smith, marking and speaking at the occasion.