Southend Victoria AVIS

AVIS system installation from Cairn Cross along the existing rolling stock carriage wash facility at Southend Victoria Depot.

Customer

Greater Anglia

Date Completed

2022

Sector

Rail Infrastructure

Project Overview

AVIS system installation from Cairn Cross along the existing rolling stock carriage wash facility at Southend Victoria Depot.


01.

The Challenge

To reduce TOC Rolling Stock Maintenance requirements, an Automated Vehicle Maintenance System (AVIS) was required along the existing Carriage Wash Road at Southend Victoria, being the first of its kind in the United Kingdom.
This would include structural bases to allow a safe and secure installation, whilst maintaining an Operational Railway.

02.

The Solution

Several Possession and Isolations were taken along the existing Carriage Wash Road to allow excavation and installation, which included specialised Crane lifts, 20m of new P-Way, and a comprehensive electrical fit-out.
Structural calculations were made to ensure the concrete aprons could withstand the specialist equipment, and a full perimeter Share Barrier erected to reduce any risk of Laser damage.

03.

The Result

The AVIS now provides the TOC opportunity to reduce their maintenance requirements of either Rolling Stock by capturing laser measurements of key train components.
New Shade Barriers and Walkways provide safe access to and inside the facility, as well as a full Earthing & Bonding arrangement.