Wembley Wheel Lathe Replacement

A design and build project with Cairn Cross as the main contractor replacing a wheel lathe and reconstructing a maintenance pit.

Customer

Alstom

Date Completed

2013

Sector

Rail Infrastructure

Project Overview

A design and build project with Cairn Cross as the main contractor replacing a wheel lathe and reconstructing a maintenance pit.


Cairn Cross depot maintenance pit modifications
01.

The Challenge

This project was delivered as a design and build contract with Cairn Cross as the main contract to install a new
Hegenscheidt CNC double headed under floor wheel lathe replacing the existing single headed wheel lathe.

Alstom Wembley Train Wheel Lathe Replacement by Cairn Cross
02.

The Solution

To complete the works, Cairn Cross removed the existing wheel lathe and demolished the existing maintenance pit. A new maintenance pit was formed and constructed with associated mechanical and electric fit out. The new double headed wheel lathe was installed.

Wembley Train Wheel Lathe Replacement by Cairn Cross
03.

The Result

The building and wheel lathe facility extension allows Alstom to accommodate the new 11-car Pendolino train rolling stock within their fleet.