Cairn Cross developed and delivered a state-of-the-art washdown facility
Customer
Network RailDate Completed
July 2026Sector
Rail InfrastructureProject Overview
Cairn Cross was appointed by Network Rail to design and deliver a new underframe wash facility at Wigan Springs Depot for the MPV Sandite rolling stock fleet.
The £2.4 million project involved the construction of a modern automated washdown facility, including drainage infrastructure, civil engineering works, mechanical and electrical installations, testing, and staff training. Designed as a comprehensive cleaning solution, the facility provides efficient cleaning of both the vehicle undercarriage and sides while improving operational performance and environmental compliance.
Project Details
Services delivered included:
- Washdown facility construction
- Drainage infrastructure
- Civil works
- M&E installations
- Testing
- Fabrication
- Doors