Wimbledon Wheel Lathe

Cairn Cross Civil Engineering Limited completed a replacement of a rail depot pit drop and train wheel lathe.

Customer

South West Trains

Date Completed

2015

Sector

Rail Infrastructure

Project Overview

Cairn Cross Civil Engineering Limited completed a replacement of a rail depot pit drop and train wheel lathe.


Wimbledon South West Trains Wheel Lathe Pit Excavation Cairn Cross
01.

The Challenge

This project was delivered as a design and build contract with Cairn Cross Civil Engineering as the Principal Contractor to install a new Hegenscheidt CNC underfloor wheel lathe.

Wimbledon Wheel Lathe Pit Excavation Cairn Cross
02.

The Solution

The existing machinery was removed and the original pit was demolished. A new maintenance wheel lathe pit was constructed and a new wheel lathe and Swarf Conveyor was installed. New sub mains, distribution units and small power was supplied to the depot.

Wimbledon South West Trains Wheel Lathe Cairn Cross
03.

The Result

The project was delivered back to the client on time and included the installation of the Cairn Cross Solutions Endurance Luminaire – a robust lighting solution for maintenance pits.