Eastcroft Walkways and Lighting
Design, supply and install upgrade works for EMR at Eastcroft depot
Customer
EMRDate Completed
March 2026Sector
Rail InfrastructureProject Overview
Eastcroft Upgrade Works
Design, supply, and installation of a 145LM GRP walkway complete with integrated LED strip lighting along its full length. Works also included the installation of LED lighting to the drip tray throughout the main shed to improve footpath visibility.
Additionally, non-compliant handrails were removed and replaced with 45LM of compliant GRP handrails, alongside the modification and extension of an existing GRP walkway to Road 14.
Project Details
Services delivered included:
- GRP Walkways
- GRP Handrails
- LED Lighting