Mechanical and Electrical Services

Cairn Cross Mechanical & Electrical Services

Cairn Cross provides mechanical and electrical services across the UK, including DNO installations, LV/HV systems, substations, lighting, ventilation, CCTV, and fire alarm installations.

Integrated M&E Solutions for Infrastructure and Rail Environments

Cairn Cross delivers comprehensive mechanical and electrical services tailored to complex infrastructure, rail, and industrial environments across the UK. Operating as a principal contractor with in-house design capabilities, we provide fully integrated M&E systems that support safe, efficient, and compliant operations.

Our experienced engineers and project teams manage projects from concept and design through to installation, commissioning, and ongoing support, ensuring seamless delivery with minimal disruption to live operational environments.

Operating in complex and live environments, our team combines technical expertise with practical delivery to ensure safe, efficient, and fully compliant installations that support long-term operational performance.

Our Mechanical & Electrical Services

Cairn Cross provides a complete range of specialist M&E services, including:

  • DNO Installations
  • LV & HV Installations
  • Substations
  • Fume Extraction Systems
  • Lighting Installations
  • Heating & Ventilation Systems
  • CCTV Systems
  • Fire Alarm Installation

Each system is designed and delivered in accordance with UK industry standards, ensuring reliability, efficiency, and long-term performance.

 

DNO Installations

We manage and deliver DNO (Distribution Network Operator) installations, ensuring safe and compliant connections to the national grid. Our services include coordination with utility providers, infrastructure preparation, and full integration with site electrical systems.

LV & HV Installations

Cairn Cross provides low voltage (LV) and high voltage (HV) electrical installations to support new developments, depot upgrades, and infrastructure enhancements. Our solutions are engineered for resilience, scalability, and operational reliability.

Substations

We design and construct electrical substations to support increased capacity, power upgrades, and new-build facilities. Our services include foundations, switchgear installations, containment systems, and full commissioning.

Fume Extraction Systems

Our team designs and installs fume extraction systems within rail depots and industrial environments to improve air quality, enhance safety, and meet environmental compliance standards.

Lighting Installations

We deliver internal and external lighting systems engineered to improve visibility, safety, and energy efficiency across operational environments, including depots, maintenance facilities, and infrastructure sites.

Heating & Ventilation Systems

Cairn Cross installs heating and ventilation systems that enhance environmental control and workforce comfort within industrial and rail facilities. Our solutions are designed for efficiency, compliance, and long-term performance.

CCTV Systems

We provide integrated CCTV systems to improve site security, operational oversight, and asset protection. All installations are carefully planned to ensure seamless integration within existing infrastructure.

Fire Alarm Installation

Our fire alarm systems are designed and installed to meet current fire safety regulations and industry standards, providing reliable detection, clear notification, and enhanced protection for personnel and assets.

 

Safe, Compliant, and Efficient Delivery

Working within live operational sites requires precision planning and strict adherence to safety standards. Cairn Cross ensures:

  • Full CDM 2015 compliance
  • NICEIC-certified electrical installations
  • Integration with existing infrastructure
  • Minimal operational disruption
  • Energy-efficient and future-ready systems
  • Thorough testing and commissioning
NICEIC Certification for Cairn Cross

 

Cairn Cross is proud to be NICEIC accredited. This prestigious accreditation reflects our team’s technical expertise, rigorous safety protocols, and dedication to delivering exceptional electrical services. For our clients, this provides confidence that all electrical works are safe, compliant, and completed to the highest industry standards. We have proudly held this accreditation since 2014.

 

Why Choose Cairn Cross for Mechanical & Electrical Services

With extensive experience across rail, infrastructure, and industrial sectors, Cairn Cross combines engineering expertise with practical delivery. Our turnkey approach ensures mechanical and electrical systems are seamlessly integrated, technically robust, and aligned with each client’s operational requirements.

Allerton TrackPan

TrackPan installation for Buckinghams at Allerton Train Depot

Read More

Kings Heath

Siemens appointed Cairn Cross to construct a multifunctional facility at Kings Heath.

Read More

GBRf Peterborough Maintenance Hub DNO

Read More

Tonbridge Maintenance Facility

Cairn Cross built a new £2.5 million maintenance facility in Tonbridge to support GB Railfreight’s growing locomotive fleet.

Read More

St. Phillips Marsh Carriage Wash Upgrade

Replacement of a carriage wash and plant room equipment

Read More

Peterborough Maintenance Hub

A Design and build project to supply a new rail maintenance hub facility with a new building and p-way siding.

Read More

Kettering Train Hand Wash Facility

New hand washing facilities and TrackPan walkway installation to allow workers safe access to the train.

Read More

Machynlleth Depot Upgrades

A Design & Build project to supply a brand new tandem wheel lathe facility with new building and new p-way siding.

Read More

Central Rivers Wheel Lathe

A Design & Build project to supply a brand new tandem wheel lathe facility with new building and new p-way siding.

Read More

Southend Victoria AVIS

AVIS system installation from Cairn Cross along the existing rolling stock carriage wash facility at Southend Victoria Depot.

Read More

Tim Horton’s Restaurants

Cairn Cross was instructed to undertake all external civil works on a build-only basis for a new restaurant chain.

Read More

Hull Botanic Gardens Maintenance Depot Extension

Rail depot infrastructure upgrades and structural modifications to rail shed building.

Read More

King’s Heath AVIS

To install an AVIS system along the existing carriage wash at King’s Heath Depot

Read More

Greenholme Mills

Groundworks to renovate a textile mill into luxury apartments.

Read More

St Nicholas Church Retaining Wall Restoration

Cairn Cross has completed works repairing a retaining wall on the boundary of St Nicholas Church, Bradfield.

Read More

Oxley Depot Subsidence

Due to subsidence issues, Cairn Cross replaced 137m length of the Road 16 rail pit walls and associated works.

Read More

Glasgow AVIS & Carriage Wash

Design and build project to replace an AVIS and carriage was facility at SPT depot.

Read More

Neville Hill Wheel Lathe

Project to deliver the civils and foundations for the installation of the Network Rail owned Wheel Lathe.

Read More

A511 Junction & Level Crossing Works

This project formed part of the Bardon Hill Quarry Extension Project – Phase 1. The requirement was for upgrade works to the A511 highway and upgrade of the existing Level Crossing.

Read More

Tingley Mills Phase 1 Infrastructure Works

As part of the Tingley Mills Residential Phase One redevelopment, Cairn Cross supplied various groundworks, drainage, storm attenuation and S278 surfacing works.

Read More

Hayle Bridge Strengthening Works

Strengthening works to the bridge spanning the Copperhouse Pool tidal reservoir

Read More

CET Upgrade & Installation at Stockport

Design and build project to upgrade the Stockport Sidings CET system to enable CET operations on the new rolling stock fleet.

Read More

Sheffield LMD Works

Project to increase the servicing capacity at Sheffield Depot. The provision of Canopies, services, lighting and TrackPan containment at each end of the shed increased fueling provisions, AdBlue, CET point, expanded oil distribution facility.

Read More

Wednesbury Access Platforms

Cairn Cross built Steel Structure and gantry walkways to access the top of the trains in the depot.

Read More

Oxford Beech House Basement Works

The project required the excavation and installation of a new waterproof reinforced concrete basement to support a five-story student accommodation building.

Read More

Trafford Wheel Lathe

A Design & Build project to install a new Wheel Lathe, swarf conveyor and associated works.

Read More

Toton Wheel Lathe

DB Schenker required a new U2000-400 underfloor wheel lathe at Toton to replace the current ageing Lathe. Cairn Cross removed the old Lathe and altered the existing pit to accept the new Lathe.

Read More

Elland Road Bridge Replacement

Cairn Cross worked as a Specialist Subcontractor to help deliver a replacement of a two-track bridge in Leeds, Yorkshire.

Read More

Wimbledon Wheel Lathe

Cairn Cross Civil Engineering Limited completed a replacement of a rail depot pit drop and train wheel lathe.

Read More

New RRV Maintenance Shed at Crewe

Design and build scheme to provide a new shed facility to accommodate Road Rail Vehicles (RRV) on the depot.

Read More

Train Wash Systems in Perth

Train Wash Systems Facility was constructed along with associated electrical and waterworks in Perth, Scotland.

Read More

Carriage Wash Installation at Holyhead

A Design and Build contract to deliver a new carriage wash shed and facilities to wash trains on the sidings at night so that vehicles are cleaned and maintained before leaving the depot in the morning.

 

Read More

Old Flatts Bridge Strengthening Works

Due to the shortening of the span between the abutment faces, the client required rehabilitation to restrengthen the bridge.

Read More

Longsight Front Entrance and Car Park

A new security building and car park facility were required at the entrance to the existing maintenance depot.

Read More

Stoke-on-Trent Wheel Lathe

Depot upgrades, including a new rail Wheel Lathe, foundations and external concrete access roads civil engineering works.

Read More

Gosforth Train Wash

A Design & Build project to replace an existing train wash with a new facility, including a water recovery system.

Read More

Longsight Wheel Lathe Installation

Replacement wheel lathe and maintenance pit reconstruction.

Read More

Portobello Carriage Wash Installation

Installation of CET modules and train carriage wash facility for East Coast Mainline in Portobello, Edinburgh

Read More

Wembley Wheel Lathe Replacement

A design and build project with Cairn Cross as the main contractor replacing a wheel lathe and reconstructing a maintenance pit.

Read More

Craigentinny Underfloor Wheel Lathe Installation

Turnkey design and build contract to replace a single-headed wheel lathe with a new single headed Hegenscheidt CNC wheel lathe requiring actuations to the existing structure.

Read More

Thornhill Bridge Strengthening Works

This project was to supply grit blast painting and a new concrete bridge deck to comply with highway loadings.

Read More

Oxley Train Depot Extension

Provision of a new shed facility to accommodate the new 11 car fleet of trains.

Read More

Queens Road New Maintenance Depot

Design and build contract for the provision of a maintenance workshop and associated works.

Read More

Controlled Sewer Overflow (CSO) Installation at Darnall

Construction and associated works of multiple Combined Sewer Overflow (CSO) units for Yorkshire Water.

Read More

Todwick Road Bridge Deck Replacement

Working as a specialist subcontractor, Cairn Cross helped deliver the deck replacement on behalf of Ringway.

Read More