Rail Services

Rail Services

Cairn Cross delivers specialist rail services across the UK, including jacking systems, bogie drops, wheel lathes, P-Way, power upgrades, modular buildings, and depot protection systems. Safe, compliant, and turnkey delivery.

Specialist Infrastructure Solutions for Rail and Depot Environments

Cairn Cross delivers specialist rail infrastructure and depot works across England, Scotland, and Wales. We provide fully managed, design-and-build solutions tailored to rail operators, maintenance depots, and infrastructure environments.

With extensive experience working in live rail environments and safety-critical conditions, our team combines engineering expertise with practical delivery to ensure safe, efficient, and high-quality outcomes across all rail projects.

Rail Services

Cairn Cross offers a comprehensive range of rail and depot infrastructure services, including:

  • Jacking Systems
  • Bogie Drops
  • Wheel Lathes
  • Overhead Line Equipment (OLE) and Third Rail Works
  • P-Way (Permanent Way)
  • Shore Supplies
  • Power Upgrades
  • Track Crossings
  • TrackPan Installation
  • Cranes and Lifting Installations
  • Depot and Industrial Doors
  • Modular Buildings
  • Bogie Rotators
  • High Level Access Platforms
  • Driver Hop-Ups
  • Depot Protection Systems and Interlocking
  • Sanding Systems
  • Floor Painting and Depot Markings

Each project is delivered with a focus on safety, compliance, reliability, and long-term operational performance.

 

Jacking Systems

We install and integrate rail vehicle jacking systems within maintenance depots, ensuring precise alignment, structural support, and safe operation within existing or new facilities

Bogie Drops

Cairn Cross delivers civil and structural works required for bogie drop installations, including pit construction, structural support, drainage, and integration with depot infrastructure.

Wheel Lathes

We provide the enabling works and infrastructure required for wheel lathe installations, including foundations, service connections, and structural modifications to support heavy engineering equipment.

Overhead Line Equipment and Third Rail

Our team carries out civil engineering works associated with OLE and third rail systems, including bases, trough routes, ducting, and associated infrastructure to support safe and reliable electrification systems.

P-Way (Permanent Way)

We undertake permanent way works including track installation, renewals, alignment, and associated civil engineering to support safe and efficient rail operations.

Shore Supplies

Cairn Cross installs shore supply systems to enable efficient and sustainable power delivery to rail vehicles within depots, reducing emissions and improving operational efficiency.

Power Upgrades

We deliver infrastructure and civil works required for depot power upgrades, including cable routes, containment, equipment bases, and structural modifications.

Track Crossings

We design and construct safe and durable track crossings for pedestrian, vehicle, and operational use within depots and rail facilities.

TrackPan Installation

Our team installs TrackPan and other environmental containment systems designed to manage spills, improve environmental protection, and support compliant depot operations.

Cranes and Lifting Installations

We provide foundations, structural works, and infrastructure to support the installation of overhead cranes and lifting equipment in rail and industrial environments.

Depot and Industrial Doors

Cairn Cross installs and modifies large-format depot doors, ensuring structural integration, reliability, and compliance with operational requirements.

Modular Buildings

We deliver foundations, services, and installation support for modular buildings used as offices, welfare facilities, control rooms, and operational spaces within rail environments.

Bogie Rotators

We carry out the civil and structural works required to install bogie rotators, ensuring stability, alignment, and integration with depot layouts.

High Level Access Platforms

Our team constructs high-level access platforms designed to provide safe maintenance access to rail vehicles, tailored to specific depot configurations.

Driver Hop-Ups

We install driver hop-ups and access systems to improve safety and efficiency for train crews and maintenance teams.

Depot Protection Systems and Interlocking

Cairn Cross installs infrastructure to support depot protection systems, including interlocking, safety barriers, and associated civil works to enhance operational safety.

Sanding Systems

We provide the infrastructure required for sanding systems, including equipment bases, service connections, and integration within depot environments.

Floor Painting and Depot Markings

We carry out specialist floor coatings, anti-slip finishes, and line marking to improve safety, organisation, and operational efficiency within rail depots and workshops.

 

Safe, Compliant, and Efficient Delivery

Cairn Cross operates as a principal contractor with in-house design capabilities, ensuring seamless project integration from concept through to completion. Our approach prioritises:

  • CDM 2015 compliance
  • Health and safety excellence
  • Environmental responsibility
  • Programme efficiency
  • Cost certainty

 

Why Choose Cairn Cross for Rail Services

With over 30 years of experience delivering infrastructure and specialist rail projects across the UK, Cairn Cross combines technical expertise, practical site knowledge, and collaborative delivery. We provide robust, reliable solutions designed to meet the operational, safety, and performance requirements of modern rail environments.

Toton Rail Depot Wheel Lathe

Allerton TrackPan

TrackPan installation for Buckinghams at Allerton Train Depot

Read More

Kings Heath

Siemens appointed Cairn Cross to construct a multifunctional facility at Kings Heath.

Read More

GBRf Peterborough Maintenance Hub DNO

Read More

Tonbridge Maintenance Facility

Cairn Cross built a new £2.5 million maintenance facility in Tonbridge to support GB Railfreight’s growing locomotive fleet.

Read More

St. Phillips Marsh Carriage Wash Upgrade

Replacement of a carriage wash and plant room equipment

Read More

Peterborough Maintenance Hub

A Design and build project to supply a new rail maintenance hub facility with a new building and p-way siding.

Read More

Kettering Train Hand Wash Facility

New hand washing facilities and TrackPan walkway installation to allow workers safe access to the train.

Read More

Machynlleth Depot Upgrades

A Design & Build project to supply a brand new tandem wheel lathe facility with new building and new p-way siding.

Read More

Central Rivers Wheel Lathe

A Design & Build project to supply a brand new tandem wheel lathe facility with new building and new p-way siding.

Read More

Southend Victoria AVIS

AVIS system installation from Cairn Cross along the existing rolling stock carriage wash facility at Southend Victoria Depot.

Read More

Tim Horton’s Restaurants

Cairn Cross was instructed to undertake all external civil works on a build-only basis for a new restaurant chain.

Read More

Hull Botanic Gardens Maintenance Depot Extension

Rail depot infrastructure upgrades and structural modifications to rail shed building.

Read More

King’s Heath AVIS

To install an AVIS system along the existing carriage wash at King’s Heath Depot

Read More

Greenholme Mills

Groundworks to renovate a textile mill into luxury apartments.

Read More

St Nicholas Church Retaining Wall Restoration

Cairn Cross has completed works repairing a retaining wall on the boundary of St Nicholas Church, Bradfield.

Read More

Oxley Depot Subsidence

Due to subsidence issues, Cairn Cross replaced 137m length of the Road 16 rail pit walls and associated works.

Read More

Glasgow AVIS & Carriage Wash

Design and build project to replace an AVIS and carriage was facility at SPT depot.

Read More

Neville Hill Wheel Lathe

Project to deliver the civils and foundations for the installation of the Network Rail owned Wheel Lathe.

Read More

A511 Junction & Level Crossing Works

This project formed part of the Bardon Hill Quarry Extension Project – Phase 1. The requirement was for upgrade works to the A511 highway and upgrade of the existing Level Crossing.

Read More

Tingley Mills Phase 1 Infrastructure Works

As part of the Tingley Mills Residential Phase One redevelopment, Cairn Cross supplied various groundworks, drainage, storm attenuation and S278 surfacing works.

Read More

Hayle Bridge Strengthening Works

Strengthening works to the bridge spanning the Copperhouse Pool tidal reservoir

Read More

CET Upgrade & Installation at Stockport

Design and build project to upgrade the Stockport Sidings CET system to enable CET operations on the new rolling stock fleet.

Read More

Sheffield LMD Works

Project to increase the servicing capacity at Sheffield Depot. The provision of Canopies, services, lighting and TrackPan containment at each end of the shed increased fueling provisions, AdBlue, CET point, expanded oil distribution facility.

Read More

Wednesbury Access Platforms

Cairn Cross built Steel Structure and gantry walkways to access the top of the trains in the depot.

Read More

Oxford Beech House Basement Works

The project required the excavation and installation of a new waterproof reinforced concrete basement to support a five-story student accommodation building.

Read More

Trafford Wheel Lathe

A Design & Build project to install a new Wheel Lathe, swarf conveyor and associated works.

Read More

Toton Wheel Lathe

DB Schenker required a new U2000-400 underfloor wheel lathe at Toton to replace the current ageing Lathe. Cairn Cross removed the old Lathe and altered the existing pit to accept the new Lathe.

Read More

Elland Road Bridge Replacement

Cairn Cross worked as a Specialist Subcontractor to help deliver a replacement of a two-track bridge in Leeds, Yorkshire.

Read More

Wimbledon Wheel Lathe

Cairn Cross Civil Engineering Limited completed a replacement of a rail depot pit drop and train wheel lathe.

Read More

New RRV Maintenance Shed at Crewe

Design and build scheme to provide a new shed facility to accommodate Road Rail Vehicles (RRV) on the depot.

Read More

Train Wash Systems in Perth

Train Wash Systems Facility was constructed along with associated electrical and waterworks in Perth, Scotland.

Read More

Carriage Wash Installation at Holyhead

A Design and Build contract to deliver a new carriage wash shed and facilities to wash trains on the sidings at night so that vehicles are cleaned and maintained before leaving the depot in the morning.

 

Read More

Old Flatts Bridge Strengthening Works

Due to the shortening of the span between the abutment faces, the client required rehabilitation to restrengthen the bridge.

Read More

Longsight Front Entrance and Car Park

A new security building and car park facility were required at the entrance to the existing maintenance depot.

Read More

Stoke-on-Trent Wheel Lathe

Depot upgrades, including a new rail Wheel Lathe, foundations and external concrete access roads civil engineering works.

Read More

Gosforth Train Wash

A Design & Build project to replace an existing train wash with a new facility, including a water recovery system.

Read More

Longsight Wheel Lathe Installation

Replacement wheel lathe and maintenance pit reconstruction.

Read More

Portobello Carriage Wash Installation

Installation of CET modules and train carriage wash facility for East Coast Mainline in Portobello, Edinburgh

Read More

Wembley Wheel Lathe Replacement

A design and build project with Cairn Cross as the main contractor replacing a wheel lathe and reconstructing a maintenance pit.

Read More

Craigentinny Underfloor Wheel Lathe Installation

Turnkey design and build contract to replace a single-headed wheel lathe with a new single headed Hegenscheidt CNC wheel lathe requiring actuations to the existing structure.

Read More

Thornhill Bridge Strengthening Works

This project was to supply grit blast painting and a new concrete bridge deck to comply with highway loadings.

Read More

Oxley Train Depot Extension

Provision of a new shed facility to accommodate the new 11 car fleet of trains.

Read More

Queens Road New Maintenance Depot

Design and build contract for the provision of a maintenance workshop and associated works.

Read More

Controlled Sewer Overflow (CSO) Installation at Darnall

Construction and associated works of multiple Combined Sewer Overflow (CSO) units for Yorkshire Water.

Read More

Todwick Road Bridge Deck Replacement

Working as a specialist subcontractor, Cairn Cross helped deliver the deck replacement on behalf of Ringway.

Read More